Toto je starší verze dokumentu!
Once the 4D section of the SDR is completed and verified by Bobcat Quality (there will be Yes next to the word Verified) an email will be sent to the choosen contacts in the Supplier record.
The SDR can be once again edited by clicking the detail.
The 4D section must be Verified by Bobcat Quality. The verification means Bobcat is satisfied with the RC details provided by Supplier. If Supplier doesn't respond in time to the SDR Bobcat might choose to scrap the defective parts. In this case the actual date when the parts were scrapped will be filled in the Send/Scrap field.
If Supplier requests the parts to be sent back for analysis of Root Cause, the field Send/Scrap, Shipping cost, and Tracking # will also be populated by Bobcat with the relevant data.
Supplier editable data exist in this section.
To save your changes to the SDR it is important to trully SAVE the SDR. Saving is done by clicking on the change button.